Two Storey Extension, Largs
In progress

Two Storey Extension, Largs

Our largest residential project to date. A two storey side and rear extension in Largs, adding a sitting room, dining room, bathroom and utility downstairs and a full master suite upstairs, built from the ground up by our own team.

Two storey extension · Largs

About this project

This is our largest residential project to date: a two storey extension wrapping the side and rear of a detached corner home in Largs.

Downstairs, the extension adds a new sitting room, a dining room opening onto the garden through large sliding doors, a bathroom and a utility room, with the existing kitchen, hallway and entrance reworked to tie it all together. Upstairs is a full master suite with a dressing area, en-suite and a Juliet balcony.

The groundwork alone was a big job, with over 220 tonnes of spoil taken away. Reinforced foundations were dowelled into the existing ones, the existing drain running across the plot was bridged, and a ventilated suspended floor went in before the timber frame, steelwork and roof trusses went up.

Outside, the extension is finished in render to match the house, with grey Cedral cladding, our go to cladding, aluminium windows and a tiled hip roof that sits naturally with the original. Inside, two new bathrooms, a utility and fitted storage were completed, and the job finished with new paving, monoblock and landscaping all round the plot.

From the first dig in January 2026 our own team has managed every stage, including the building warrant inspections along the way. The main build is complete and we are now finishing some additional porch work.

Project facts

  • Location
    Largs, North Ayrshire
  • Project
    Two storey side and rear extension with internal alterations and landscaping
  • Time on site
    January 2026 to date
  • Features
    Reinforced foundations, steelwork, timber frame, tiled hip roof, render and grey Cedral cladding, aluminium windows, large sliding doors, Juliet balcony, two bathrooms, utility, paving and landscaping

Scope of work

  • Site set up, excavation and spoil removal
  • Reinforced strip foundations dowelled into the existing
  • Drainage bridging and new drainage connections
  • Underbuilding, ventilated solum and insulated suspended floor
  • Steelwork, timber frame and intermediate floor
  • Prefabricated trusses and tiled hip roof
  • Render, grey Cedral cladding, aluminium windows and sliding doors
  • Sitting room, dining room, bathroom and utility
  • Master suite with dressing area, en-suite and Juliet balcony
  • Paving, monoblock and landscaping
Stage by stage

How the Largs extension is coming together

From the first dig in January 2026 to the finishing work now under way, here is how our largest residential project is being built. We add each new stage as it happens.

  1. July 2025
    July 2025

    Before work started

    This detached home in Largs sits on a corner plot. The plan was a two storey side and rear extension: a sitting room, dining room, bathroom and utility downstairs, and a master suite with dressing area and en-suite upstairs. Before anything was drawn up, the drainage running across the plot was checked.

  2. January 2026
    January 2026

    Breaking ground

    The site was set up, the boards went up and the digging started. There was a huge amount of groundwork on this job before the walls could go up.

  3. January 2026
    January 2026

    Reinforced foundations

    Reinforced strip foundations were dug and the steel laid, with the new foundations dowelled into the existing ones where the extension meets the house.

  4. January 2026
    January 2026

    Concrete poured

    The foundations were poured and left to cure before the underbuilding started.

  5. Late January 2026
    Late January 2026

    Underbuilding

    Blockwork was built up from the foundations to floor level, with damp proofing and the new drainage runs laid in.

  6. February 2026
    February 2026

    The ground floor

    The suspended timber ground floor went in over a ventilated solum, insulated and decked ready for the frame.

  7. February 2026
    February 2026

    Steel and the first walls

    Steel posts and beams went in to open up the new spaces, and the first walls started to go up.

  8. February 2026
    February 2026

    Drainage

    New drainage was laid and connected into the existing system, bridging the old drain where the foundations crossed it.

  9. March 2026
    March 2026

    Scaffold and timber kit

    Scaffold went up all round and the timber frame kit was delivered and erected.

  10. March 2026
    March 2026

    Roof trusses

    The prefabricated roof trusses and hip framing went up, tying the new roof into the existing house.

  11. Late March 2026
    Late March 2026

    Membrane and battens

    The roof was covered in breather membrane and battened, making the extension weathertight.

  12. Late March 2026
    Late March 2026

    Inside the frame

    Inside, the walls were insulated and the first fix services started, and the size of the new rooms could be seen.

  13. April 2026
    April 2026

    Roof tiles

    The roof was tiled to match the existing house, with new ridges, hips and flashings.

  14. April 2026
    April 2026

    Opening up and boarding

    Plasterboard went up through the new rooms and the openings into the existing house were formed.

  15. April 2026
    April 2026

    Render and glazing

    The scaffold came down to reveal the rendered walls, new aluminium windows and the large sliding doors to the garden.

  16. May 2026
    May 2026

    Bathrooms

    The new bathroom and en-suite were tiled and fitted out.

  17. May 2026
    May 2026

    Kitchen and utility

    The kitchen alterations and new utility were fitted, along with fitted storage in the new rooms.

  18. June 2026
    June 2026

    Paving and landscaping

    Outside, new paving, monoblock and edging went down round the extension, tidying up the whole plot.

  19. Autumn 2026
    Autumn 2026 · Latest

    Finishing and porch work

    The main extension is complete: a new sitting room, dining room, bathroom and utility downstairs and a full master suite with a Juliet balcony upstairs, finished outside in render and grey Cedral cladding. We are now back on site for some additional porch work, and finished photos will follow.

On camera

Watch the build

Short updates filmed on site as the job has gone along.

Gallery

Project photos

Before and after

Same corner plot. A whole new side to the house.

Drag the slider to see the house before work started and the two storey extension today.

Before: two storey extension in Largs
After: two storey extension in Largs
BeforeNow