About this project

The owners of this stone built home in Darvel wanted a brighter, more open ground floor that still felt like an older house. The plan was to open up the kitchen and dining space, replace the tired staircase, add a downstairs WC and finish the whole floor to a high standard.

We took out the wall between the kitchen and dining room and kept the original dark timber beams and posts on show, so they now frame the new kitchen. The walls were insulated, and the electrics and plumbing were reworked for the new layout, with black track spotlights, pendant lights over the island and lighting under the wall units.

The new Wren kitchen went in with a large island, white worktops and tall larder units beside the garden door. In the hall, the old staircase came out and a new StairBox staircase went in with square newel posts and black metal spindles. The space underneath became a compact WC with a countertop basin and black taps, behind a panelled door.

A black framed glazed door now leads off the hall, and the deep alcoves in the living and dining rooms were plastered with new sills. LVT flooring runs right through the ground floor, and the whole house was finished with fresh decoration.

Suppliers on this job: Wren Kitchens for the kitchen, StairBox for the staircase and Central Plumbing Supplies for the WC and basin.

Project facts

  • Location
    Darvel, East Ayrshire
  • Project
    Ground floor home renovation with an open plan kitchen, new staircase and understair WC
  • Time on site
    July to August 2026, about six weeks
  • Features
    Wall taken out with the original timber beams and posts kept as a feature, insulation, electrics and plumbing, track and pendant lighting, Wren kitchen with island, StairBox staircase with black metal spindles, understair WC, black framed glazed door, plastered alcoves, LVT flooring, decoration

Scope of work

  • Wall taken out between the kitchen and dining room
  • Original timber beams and posts kept and exposed as a feature
  • Insulation and making good to walls and ceilings
  • Electrics and plumbing reworked, with track spotlights, pendants and under unit lighting
  • Wren kitchen fitted with an island, white worktops and tall larder units
  • Old staircase removed and a new StairBox staircase fitted with black metal spindles
  • Understair WC with toilet, countertop basin and black taps
  • Black framed glazed internal door in the hall
  • Living and dining alcoves plastered with new sills
  • LVT flooring through the ground floor
  • Skirtings, finishing joinery, decoration and clean down
Stage by stage

How the Darvel renovation came together

From stripping out the ground floor in early July 2026 to the finished kitchen, staircase and WC in August.

  1. Early July 2026
    Early July 2026

    Opening up the ground floor

    We stripped the ground floor back and took out the wall between the kitchen and dining room. The original timber beams and posts were kept, ready to become the main feature of the new open plan room.

  2. July 2026
    July 2026

    Framing, insulation and services

    New stud walls were framed against the old stone walls and insulated, and the floor was opened up so the electrics and plumbing could be rerouted for the new layout.

  3. Mid July 2026
    Mid July 2026

    The kitchen goes in

    The Wren kitchen went in around the beams, with the tall larder housing, the island and the worktops fitted in turn.

  4. July 2026
    July 2026

    Understair WC

    The space under the stairs was framed out as a compact WC, with the toilet, a countertop basin and black taps, and a panelled door.

  5. August 2026
    August 2026

    New staircase

    The old staircase came out and a new StairBox staircase was fitted, with square newel posts, a painted finish and black metal spindles.

  6. August 2026
    August 2026

    Finished

    With LVT flooring through the ground floor, the alcoves plastered and the whole house decorated, the renovation was handed over in August 2026.

Gallery

Project photos

Now taking bookings for February 2027

Start your project

Planning something similar?

Tell us what you have in mind and where you are. We will come back to you to arrange a site visit.

CallTextWhatsApp