What could your extension cost? Get a guide price in 60 seconds → Call 0345 956 9811  |  WhatsApp
Traditional Bathroom Renovation, West Kilbride

Traditional Bathroom Renovation, West Kilbride

We stripped out and rebuilt a tired bathroom in a period home in West Kilbride, giving it a traditional look, a better layout and all new plumbing behind the walls.

Bathroom renovation · West Kilbride

About this project

The owners of this West Kilbride period home had a bathroom that was tired, badly laid out and not used as much as it should have been. They wanted a traditional look that suited the age of the house, but with modern fittings that would last. They had been let down by another contractor before, so they wanted one team to take charge of the whole job from start to finish.

Much of the work happened before any new finishes went in. Once the old bathroom was out, the plumbers traced the existing pipework, took out the runs that were no longer used and rerouted the rest to suit the new layout. The toilet was moved to a better position and its waste pipe neatly boxed in. The radiator was moved too, and we built pads into the walls so the radiator and the cabinet had solid fixings. Working in an older house meant planning around its walls and floors rather than forcing a modern layout onto them.

With the services sorted, we laid a ply floor and screed, fitted a new shower tray and tiled the walls and floor. The electrics were upgraded with LED lighting and new switches. New skirting went in, the room was painted, and every joint was finished with mastic. We supplied and fitted all the fixtures and fittings and took all the waste away at the end.

The finished bathroom has the traditional character the owners wanted, sitting comfortably with the rest of the house, while everything behind the tiles is new. The layout works better for everyday use, and the owners were pleased to finally have the job done properly.

Project facts

  • Location
    West Kilbride, North Ayrshire
  • Project
    Full bathroom strip-out and rebuild
  • Features
    Traditional finish, relocated toilet, repositioned radiator, new shower tray, full wall and floor tiling, LED lighting

Scope of work

  • Removal of the existing bathroom
  • Tracing and removing redundant pipework
  • Rerouting plumbing for the new layout
  • Toilet relocated with boxed-in waste pipe
  • Radiator repositioned, with wall pads for fixings
  • Ply flooring and screed
  • New shower tray and full wall and floor tiling
  • LED lighting and new switches
  • Skirting, painting and mastic sealing
  • Supply of all fittings and full waste removal
Gallery

Project photos

Now taking bookings for February 2027

Start your project

Planning something similar?

Tell us what you have in mind and where you are. We will come back to you to arrange a site visit.

CallTextWhatsApp