Luxury Bathroom Conversion, Kilmarnock

Luxury Bathroom Conversion, Kilmarnock

In a Kilmarnock home we split a rear family room into two: a shower room with brushed brass fittings, and a separate study and sitting room, all inside the existing footprint.

Bathroom conversion · Kilmarnock

About this project

The owners wanted a ground floor shower room without building an extension. Their rear family room was a good size, so the plan was to split it in two: a shower room with a walk-in shower, WC and vanity, and a smaller study and sitting room next to it. Both rooms had to feel like proper rooms rather than something squeezed in, and the bathroom had a clear look in mind: brushed brass fittings, warm wood effect tiles in the shower and marble effect tiles everywhere else.

The building warrant drawings were already in place. We went through them with the owners and fine tuned the layout so the shower, WC and basin each had proper space. The shower room needed natural light and ventilation, so we cut a new opening in the brick gable wall, put in new lintels, fitted a frosted double glazed uPVC window with a top opening hopper and trickle vent, and made good the brickwork outside.

Inside, the old fireplace came out and the walls were made good. Our joiners built a floor to ceiling stud partition with sound insulation, then lifted the floor so the new 100mm waste could run underneath to the existing soil drainage. Our plumber first fixed the shower, basin and WC and extended the heating to two floor to ceiling radiators, with the pipes chased into the walls so nothing is on show. Our electrician added downlights, an extractor fan, an LED mirror, a pendant light in the small hallway, new sockets and a smoke detector.

The finished shower room has a PVC ceiling on battens, large format marble effect wall tiles, wood effect tiles to the shower walls, a brushed brass trim around the window reveal and LVT flooring. It has a 1200 x 800 shower tray with brass framed glass panels, an exposed thermostatic shower in brushed brass, a wall hung vanity unit, a brass framed LED mirror and a comfort height WC. Three pre-finished oak doors were hung, a small storage cupboard was built outside the bathroom door, and the old study door was reused on the kitchen. Everything was tested and certified, and the building warrant completion paperwork was prepared at the end of the job, about four weeks after we started.

Project facts

  • Location
    Kilmarnock, East Ayrshire
  • Project
    Rear family room converted into a shower room and a separate study and sitting room
  • On site
    About four weeks, November 2025
  • Features
    New window opening in the brick gable, walk-in shower with brushed brass fittings, wood and marble effect tiles, LVT flooring, floor to ceiling radiators with hidden pipework, pre-finished oak doors

Scope of work

Scope of work

Everything we did, trade by trade

Structure and window

  • Building warrant drawings reviewed and the layout fine tuned with the owners
  • Fireplace removed and walls made good
  • New window opening cut in the brick gable wall, with new lintels
  • Frosted, double glazed white uPVC window with top hopper and trickle vent
  • Brickwork made good outside

Joinery

  • Floor to ceiling stud partition with sound insulation
  • Plywood sub floor preparation
  • PVC ceiling on timber battens
  • Three pre-finished oak doors, thumb turn lock to the shower room
  • Storage cupboard outside the shower room
  • Old door frame removed, study door moved to the kitchen

Plumbing and heating

  • Floor lifted to run a new 100mm waste to the existing soil drainage
  • Shower, basin and WC first and second fix
  • Heating extended to two floor to ceiling radiators
  • Thermostatic valves, with all pipework chased into the walls

Electrics and ventilation

  • Downlights and a pendant light in the small hallway
  • LED mirror and two double sockets
  • Mechanical extract fan
  • Smoke detector
  • Tested and certified

Tiling and finishes

  • Around 16 m² of wall tiling
  • Wood effect tiles to the shower walls
  • Marble effect tiles everywhere else
  • Brushed brass trim to the window reveal
  • LVT flooring
  • Plastering, coving and making good

Fittings and handover

  • 1200 x 800 shower tray with brass framed glass panels
  • Exposed thermostatic shower in brushed brass
  • Wall hung vanity unit, brass basin mixer and brass framed LED mirror
  • Comfort height WC with soft close seat
  • Building warrant completion paperwork
Stage by stage

How this shower room came together

From strip out in early November 2025 to the finished shower room at the end of the month, about four weeks on site.

  1. Early November 2025
    Early November 2025

    Strip out

    The fireplace came out, the old door frame was removed and the room was stripped back ready for the new layout.

  2. 7 November 2025
    7 November 2025

    A new window in the gable

    A new opening was cut in the brick gable wall and new lintels went in, giving the shower room its own natural light and ventilation.

  3. 10 November 2025
    10 November 2025

    Partition, drainage and first fix

    The floor was lifted so the new 100mm waste could run underneath to the existing soil drainage. The stud partition was insulated for sound and the plumbing and electrics were first fixed.

  4. 12 to 14 November 2025
    12 to 14 November 2025

    Window fitted

    The frosted double glazed window was fitted with a top hopper and trickle vent, and the brickwork was made good around it.

  5. 15 November 2025
    15 November 2025

    Ceiling and tiling

    The PVC ceiling went up on battens, then the large format marble effect tiles and wood effect shower tiles were laid with levelling clips for flat, tight joints.

  6. Late November 2025
    Late November 2025

    The finished shower room

    The shower, glass panels, vanity, LED mirror, WC, radiators and oak doors went in, followed by testing, the electrical certificate and the completion paperwork for the building warrant.

Gallery

Project photos

Before and after

Same room. A new shower room.

Drag the slider to see the room in the first week, stripped back with the new window opening cut, and the finished shower room.

Before: shower room in Kilmarnock
After: shower room in Kilmarnock
BeforeAfter
In their words

What the clients said

Excellent project from start to finish. Cutwood’s attention to detail is fantastic. The joiner, Graeme, and plumber, Robbie, couldn’t have been more helpful in their advice and the craftsmanship shown by the entire team was first class. Cutwood’s work ethic is great. Sticking to the task until is properly finished. Delighted with the work.
Mike, Kilmarnock

Now taking bookings for February 2027

Start your project

Planning something similar?

Tell us what you have in mind and where you are. We will come back to you to arrange a site visit.

CallTextWhatsApp